Enter your turbine parameters below and discover how much revenue you could recover by operating at the optimal efficiency point.
Configure your turbine setup
Francis — efficiency vs. load
Set your turbine parameters on the left, then hit Calculate to see the optimal operating point and projected savings.
Hydrological inputs and reservoir constraints for realistic optimization
Simulated reservoir level over 12 months with constant turbine flow = mean annual inflow
DAMagedOpt doesn't just optimize the instantaneous operating point — we optimize water stock management over the entire season to maximize your annual revenue without ever emptying your reservoir.
Estimate how much DAMagedOpt adds to your bottom line
Scaled linearly in rated power from the committed 2024 backtest: 300 MW Francis reference unit, DE-LU 2024 day-ahead, price-following baseline. An indicative prior, not your unit’s measured result.
One work email. We send this estimate as a PDF and follow up once about a diagnostic on your own turbine.
No spam. We use this to prepare your estimate and to follow up once.
Or go further now
Instant download — 2024 DE-LU full-year backtest methodology
Custom full-year backtest on YOUR turbine specs, credited toward a contract
Prefer a guided demo? Contact us
This calculator estimates a hill chart from nameplate specs. The Turbine Uplift Diagnostic runs the full 2024 year on your measured specs and returns the report in 5–7 business days — €900, credited against the first uplift contract.
Send us your turbine specsSee full-year 2024 backtest results →